日本中文字幕视频在线看-日本中文字幕网站-日本中文字幕一区二区-日本中文字幕一区二区高清在线-日本中文字幕一区二区有码在线-日本中文字幕永久在线

歡迎訪問永誠廣建公路材料(山東)有限公司網站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現在所在的位置 :首頁 - 新聞中心 > 行業資訊

行業資訊

水泥穩定碎石施工采用什么施工工藝

來源:http://m.yuanchuodian.cn/ 日期:2022-09-30
濟南水泥穩定碎石施工采用什么施工工藝呢?實際上會采用商品水穩(預拌),用機械攤鋪、壓路機碾壓的施工工藝。下面詳細講下:
What construction technology is used in Jinan cement stabilized macadam construction? In fact, the construction technology of commercial water stabilization (premix), mechanical paving and roller rolling will be adopted. Let's talk about it in detail:
1、原材料基本要求普通硅酸鹽水泥、礦渣硅酸鹽水泥、火山灰質硅酸鹽水泥都可以用于水泥穩定碎石路面基層施工,禁止使用快硬水泥、早強水泥以及其它受外界影響而變質的水泥。
1. Basic requirements for raw materials Ordinary Portland cement, slag Portland cement and pozzolanic Portland cement can be used for the construction of cement stabilized macadam pavement base. Fast hardening cement, early strength cement and other cement deteriorated by external influence are prohibited.
路面基層宜采用強度等級較低的水泥;水泥各齡期強度、安定性等應達到相應指標要求;要求水泥初凝時間3小時以上、終凝時間不小于6小時。
Cement with lower strength grade should be used for pavement base course; The strength and stability of cement at each age shall meet the corresponding index requirements; The initial setting time of cement shall be more than 3 hours and the final setting time shall not be less than 6 hours.
2、水泥穩定碎石施工前準備
2. Preparation before construction of cement stabilized macadam
①本工程水泥穩定碎石基層的下承層為水泥穩定土基層,水泥穩定碎石攤鋪須在水泥穩定土達到規定的強度、平整度、拱度等基礎上,經驗收后,才能進行攤鋪。
① The lower bearing layer of the cement stabilized macadam base course of this project is the cement stabilized soil base course. The cement stabilized macadam can only be paved after the cement stabilized soil reaches the specified strength, flatness, camber, etc.
②恢復中線。每10~15m設置一樁,用指示樁標出攤鋪寬度。
② Restore the center line. One pile shall be set every 10~15m, and the paving width shall be marked with an indicator pile.
③進行水平測量。在每一斷面上設置3個指示樁(即中心樁、左側邊樁和右側邊樁),用明顯標記標出水泥穩定碎石基層松鋪厚度和設計高程。
③ Carry out level measurement. Set 3 indicator piles (i.e. center pile, left side pile and right side pile) on each section, and mark the loose paving thickness and design elevation of cement stabilized macadam base with obvious marks.
濟南水泥穩定碎石
④培肩。為減少水泥穩定碎石混合料在碾壓過程中的側向位移,保證水泥穩定碎石壓實度,采取培肩措施,培肩上口寬50cm下口寬70cm,高度不小于水泥穩定碎石壓實厚度。為保證雨天排水,可每隔5~10m開挖臨時排水溝。
④ Shoulder training. In order to reduce the lateral displacement of cement stabilized macadam mixture during rolling and ensure the compactness of cement stabilized macadam, shoulder training measures are taken. The width of the upper opening of the shoulder is 50cm and the width of the lower opening is 70cm. The height is not less than the compacted thickness of cement stabilized macadam. To ensure drainage in rainy days, temporary drainage ditches can be excavated every 5-10m.
⑤施工前須詳細計劃安排,盡量減少橫向接縫,避免縱向接縫。
⑤ Before construction, detailed planning and arrangement shall be made to minimize transverse joints and avoid longitudinal joints.
水泥穩定碎石施工采用什么施工工藝?以上就是問題的相關解答了,您對此有什么想法或者問題咨詢,都能來我們網站http://m.yuanchuodian.cn咨詢!
What construction technology is used for cement stabilized macadam construction? The above is the answer to the question. If you have any ideas or questions, please come to our website http://m.yuanchuodian.cn consulting service
  • 上一條:修路用的瀝青到底是什么
  • 下一條:路面機械設備的維護與保養
  • 相關產品:

    主站蜘蛛池模板: 污污视频网址 | 日本一级一区二区三区 | 日本免费在线观看视频 | 久久九 | 亚洲欧美v视色一区二区 | 综合亚洲欧美日韩一区二区 | japanese黑人极品高清 | 亚洲综合在线视频 | 日韩欧一级毛片在线播无遮挡 | 射射射影院| 日本高清视频在线的 | 亚欧成人毛片一区二区三区四区 | 欧美一级日韩一级亚洲一级 | 99国产精品 | 日日摸狠狠的摸夜夜摸 | 久久性精品 | 国内不卡一二三四区 | 亚洲第一在线视频 | 欧美综合自拍亚洲综合百度 | 亚洲日本va中文字幕在线不卡 | 免费视频一区二区 | 国产爆操 | 天天影视综合 | 欧美成人午夜毛片免费影院 | www.免费视频 | 亚洲精品美女久久久久网站 | 女人被男人扒开狂躁 | 国产欧美久久久精品影院 | 亚洲国产精品成熟老女人 | a色视频| 大香萑成人网免费视频 | 99青草青草久热精品视频 | 久久99精品久久只有精品 | 日本一区二区三区久久久久 | 日韩 亚洲 欧美 中文 高清 | 国产精品日韩欧美一区二区三区 | 国产精品欧美久久久久天天影视 | 快一点使劲c我在线观看 | 日操操| 在线中文字幕观看 | 日韩在线播放中文字幕 |